
Turnkey finishing
- Plaster, paint and flooring
- Gypsum ceilings and concealed lighting
- Electrics, plumbing and HVAC
Design and delivery under one contract, with a written handover date and a warranty measured in years.
Cairo · Giza · Mansoura.
NOOR
Since 2006
200+ projects
4.9 on Google
Contracted handover
No juggling a contractor, a designer and an engineering office. One contract, one supervising engineer, one party answerable to you.




"Lux finishing" is not a specification. Every package carries a material schedule by brand, a duration, and a warranty in years.
Essential
Local porcelain · emulsion paint · local sanitaryware · HPL kitchen
1-year warranty
Plus
Spanish porcelain · Jotun paints · gypsum ceilings with lighting · acrylic kitchen
2-year warranty
Lux
Imported Italian porcelain · natural marble at entrances · German kitchen · linear lighting
3-year warranty
Super Lux
Turkish and Spanish natural marble · solid parquet · smart lighting and audio
4-year warranty
VIP
Carrara marble · rare materials to order · full home automation · fully bespoke design
5-year warranty
Drag the line on any frame. Each pair is one of our own projects — same room, same camera position, before the work and after handover.
Every project below is shown in full — reception, kitchen, bedrooms and bathrooms from the same unit. So you see all of the work, not its best angle.
An open reception in natural timber across walls and ceiling, an island kitchen with linear lighting, a master bedroom with an upholstered headboard, and a marble bathroom with a freestanding tub.





A living room with full-height curtains and light materials, a handleless kitchen, two bedrooms, and a bathroom in large-format tile with built-in wardrobes.





An open plan between living and kitchen, light materials with timber accents, and concealed lighting in every room. A full finish from bare shell in 96 days.





These units are references for the level of execution and the materials we build with. Real NOOR project sets — shown the same complete way — will replace them before launch.
We cover the whole of Cairo and Giza, plus Mansoura. If your area is not listed below, call us — we most likely build there.
Not a seventeen-step timeline nobody reads. These are the six steps you will actually go through.
Depending on the package, written into the contract with its term and its scope — not a verbal promise.
Apartments 60–120 days · villas 120–240 · commercial 30–90, counted from the day we take possession of the unit.
If we miss the agreed date, the penalty is written into the contract at a named rate. [PENALTY RATE]
The line-item schedule names every material, its brand and its size. Any substitution needs your approval in writing.
★★★★★
What mattered most is that the price never moved. What was written in the schedule is exactly what was built, and handover came four days early.
Eng. Ahmed S. — villa, Sheikh Zayed
★★★★★
I was worried about the materials, but everything arrived in the brand named in the schedule. The engineer sent a photo report every week.
Mona A. — apartment, New Cairo
★★★★★
I have worked with contractors before. The difference is that here one party is accountable. Nobody says "that's not my scope."
Eng. Karim F. — office unit, Nasr City
★★★★★
The 3D renders let me see the apartment before I spent a pound on building it. We changed two things on paper instead of on site.
Dr. Heba M. — apartment, Mansoura
We say this plainly to save your time and ours.
No. The price is tied to a signed line-item schedule. Any increase has to come from a change you request, documented as a written variation order, priced and agreed before the work starts. Nothing "comes up" after signing.
The design stage includes two free rounds of revisions before sign-off. We do not start building until you have signed the drawings and the final render.
The handover date is in the contract, and so is a late penalty at a named rate. [PENALTY RATE] The only exception is delay caused by changes you request or by late payments.
Every material is in the schedule by brand, model and size. You get a weekly photo report, and you inspect before the final payment. If something differs, you do not release the last 10%.
With a contractor you are the one coordinating the carpenter, the plumber and the electrician, and you carry the cost of every mistake. Here there is one contract, one supervising engineer, and one party answerable to you — and the price difference comes back in waste you never pay for.
The first visit and the initial estimate are free within our service areas. The detailed line-item quote follows the visit and reaches you in writing.
The whole of Cairo and Giza, plus Mansoura and the towns around it. Outside those areas, we assess case by case.
Everything from bare shell to move-in: plaster, flooring, paint, gypsum, electrics, plumbing, doors and windows, kitchen and bathrooms. Loose furniture and appliances are optional and priced separately.
You pick the unit type, the area and the level, and the button opens WhatsApp with your selections already written in. We come back with a detailed quote — not an estimate generated on a web page.
Yes. If we have a project under way or recently handed over near you, we arrange a visit once the owner agrees.
Both. Modern, minimal and neo-classic — and we help you pick what suits the unit's proportions and natural light.
We take on full renovations of finished units. Small partial work is outside our scope.
We ask about the unit, the area and the level you have in mind, and we give you an honest price range.
An engineer visits the unit, measures it and photographs it. You keep the notes even if you go no further with us.
Line items, prices and a duration. Compare it at your own pace — with no financial commitment.
Send us the size of your unit on WhatsApp and we will come back with a quote.
We reply during working hours: Saturday – Thursday, 9:00 – 18:00.
Madinaty — New Cairo, Cairo Governorate
Saturday – Thursday · 9:00 – 18:00